RC Infrastructure
Electrified rail corridor at dawn, catenary receding into the distance.
Capabilities

Three disciplines, one accountable programme.

Overhead line equipment, high-voltage distribution and enabling civils. We plan them as one schedule, resource them from one team, and commission them against one signature.

Rail · HV · Civils
Three disciplines
1
Signature
Self-delivered
End to end
Why self-delivery

One team. One schedule. One signature.

We built RC Infrastructure so that the three disciplines that sit next to each other on every electrification scheme could be delivered by one accountable team.

When OLE, HV and civils are sub-contracted across three organisations, programme risk multiplies. Possessions slip. Commissioning dates drag.

When they come from one company, the schedule has one owner, the risk register has one format, and the commissioning pack rolls up to one signature.

The three

Rail. Power. Civils.

Each discipline has a dedicated capability page with scope, systems covered, sectors, and scheme profile.

Series 2 overhead line equipment installed on a UK mainline rail corridor.01 Rail

Overhead Line Equipment

Design, install, test and commission catenary for mainline and metro. Series 1, Series 2, Mk3B and bespoke arrangements.

Rail electrification detail
Utility engineers walking into a high-voltage substation at dawn.02 Power

Power Distribution & HV

11kV to 132kV distribution, feeder stations, autotransformer sites and DNO grid connections.

Power and HV detail
Rail embankment civils works with excavator and crew.03 Civils

Civils & Groundworks

Piled foundations for OLE masts, access roads, RRAP pads, troughing routes and all enabling civils.

Civils detail
Lifecycle

Design. Install. Test and commission. Maintain.

Every scope follows the same four-phase commitment, regardless of discipline.

01

Design

Feasibility, optioneering, GRIP 1-4 design, detailed design, interface management.

02

Install

Self-delivered crews, piloted possessions, integrated civils and wiring sequencing.

03

Test & commission

Factory acceptance, site acceptance, entry-into-service, audit-ready handover packs.

04

Maintain

Planned maintenance, fault response and asset stewardship for private networks.

Lifecycle · one schedule

Design. Install. Test & commission. Maintain.

Every scope follows the same four-phase commitment, regardless of discipline. Possessions are planned to the hour. Commissioning packs roll up to one signature.

GRIP 1–4
Design stages
ENA G5/5
Commissioning std
0
RIDDOR · rolling 365
Tier-one
Client-approved
Accredited
  • RISQS accreditation
  • Link-up accreditation
  • ISO 9001, 14001 & 45001 accreditation
  • Constructionline accreditation
  • CHAS accreditation
  • Achilles UVDB accreditation

Tell us about the scheme.

Framework enquiries, PQQ support, scope reviews. First response within one working day.