Engineered to energise on time.
From 11 kV distribution to 132 kV feeders, autotransformer sites and DNO grid connections. The hidden infrastructure that decides whether a scheme lights up on programme.
From feasibility to energisation.
The hidden infrastructure that gets schemes through DNO approval, installation and test on programme.
- LV, 11kV, 33kV, 66kV and 132kV distribution
- Substations and switch rooms
- Feeder stations and autotransformer sites
- DNO grid connections (import / export)
- Protection, control and SCADA
- Cable installation: ducted, direct buried, in-trough
- Testing and commissioning (ENA G5/5, G59, G99, NR)
- Operational maintenance for private HV networks
Feasibility. Design. Build. Commission.
Route selection and DNO liaison are where most HV delays are won or lost. We engage before the connection application is filed, then carry design, build and commissioning through one accountable team.
Route selection is where most HV delays are won or lost.
We work with clients before a connection application has even been made. Route selection, point-of-connection optioneering and DNO liaison set the trajectory of the whole programme. We start here.

Design for buildability, commission, and audit.
Load studies, protection grading, earthing and bonding, full detailed design to ENA standards. Our installers will build what we draw. Our commissioning engineers will commission what they install.
Own plant, own crews, own logistics.
Self-delivered civils, cabling, switchgear installation and substation fit-out. Cable pulling through rail troughing, direct burial across rural corridors and ducted installation in urban sites. We run our own cable pulling equipment.

Audit-ready packs. Long-term relationships.
Site acceptance, point-on-wave commissioning, protection testing, SCADA integration. Then planned maintenance, fault response and emergency call-out for private HV networks.

The shape of an HV programme we would take on.
- Voltage band
- 11 kV to 132 kV
- Scope
- Greenfield feeders, brownfield upgrades, grid connections
- Duration
- 6 months to 3 years
- Value band
- GBP 500k to GBP 30m+
- Sectors
- Rail, DNO, renewables, data centres, industrial
Planning a grid connection or HV upgrade?
Pre-application route reviews, DNO liaison, PQQ and framework support. First response within one working day.