
From first survey to first service.
We design, install, test and commission overhead line equipment for mainline, metro and private rail networks across the UK. In possession, on programme, handed back ready for service.
Self-delivered, end to end.
No stitched-together supply chain. No accountability gaps at discipline boundaries.
- GRIP 1-4 design and detailed design
- Catenary systems: Series 1, Series 2, Mk3B and bespoke
- Masts, portals, small part steelwork, registration and wiring
- Isolation and possession support
- Testing and commissioning to Network Rail and ENA standards
- Entry-into-service and defect close-out
- Post-handover maintenance for private networks
- Interface with signalling, P-way and civils
Design. Install. Test. Maintain.
Every electrification scheme we take on is broken down into four phases delivered by one team on one Gantt. No stitched-together supply chain. No accountability gaps at discipline boundaries.
Interface clashes are resolved on paper, not on the rail head.
Our in-house designers work from GRIP 1 feasibility through to AFC issue. We interface early with signalling, telecoms, permanent way and civils so that interface clashes are resolved on paper, not on the rail head.
Led by engineers who came up through the corridor.
Self-delivered crews plan possessions to the hour and sequence civils and OLE on one Gantt. Contingency is built in so that trains still run at 0458 even when the weather does not cooperate.

Audit-ready on the first submission.
Our test engineers run site acceptance to a standard that clears Network Rail or infrastructure manager audit on the first pass. Commissioning packs are issued ready for entry-into-service without chase cycles.
Long-term asset stewardship for private networks.
For private networks and depot electrification, we provide planned maintenance, fault response and long-term asset stewardship. Same engineers, extended relationship.
The shape of a rail scheme we would take on.
- Route length
- 2 km to 80 km per delivery package
- Duration
- 6 months to 4 years
- Team size
- 8 to 60 depending on possession window
- Value band
- GBP 1m to GBP 40m+ per package
- Voltage
- 25 kV AC (DC on metro where sector applies)
- Settings
- Mainline, metro, light rail, depots and sidings
Starting an electrification scheme?
Framework enquiries, scope reviews, design-assist and PQQ support. First response within one working day.






